top of page

Case study: Analysing air exchange in mine tunnels

  • 作家相片: Paolo Casula
    Paolo Casula
  • 2024年6月12日
  • 讀畢需時 1 分鐘

已更新:2025年5月29日



This case study, commissioned by Italmineraria SrL, involved assessing time and efficiency of air exchange within a 14 kilometres network of tunnels, that were carved through a mountain.


Figure 1 offers a view of the mountainside from the rear, featuring color-coded surface pressure influenced by wind flow.


Remarkably, a slight pressure variation of a few Pascals among the four tunnel entrances triggers natural ventilation. Fresh air is drawn in from the higher-pressure upper entrances, while stagnant air exits through the lower ones.


Figure 1: overview of the model


Video 1 displays a 3-hour transient simulation of air exchange, presented across 180 frames with a one-minute interval. The inflow rate into the mine approximates 16 kg/s. Notably, the natural ventilation doesn’t sufficiently reach the lower part of the mine, thus suggesting the need to add forced ventilation.


Video 2 showcases the same 3-hour transient scenario, incorporating an additional forced ventilation of around 6 kg/s, positioned at the mine’s lowermost point, which ensures optimized air exchange within the tunnels.

Video 1: transient simulation with natural ventilation only

Video 2: transient simulation with added forced ventilation


 
 
 
Vento CFD logo

办公地址: Viale la Plaia 15, 09123, 卡利亚里

 

法定地址:Via Goffredo Mameli 115, 09123, Cagliari

 

 

 

© - Vento CFD srl VAT IT03698400920 保留所有权利。

 

PMI-Registroimprese.it

Vento 计算流体力学

主页

风荷载

户外舒适

接触

销售团队

基本信息

联系我们

室内舒适度

风险分析

技术规格

验证

解决方案

项目

关于

政策

隐私政策

社会的
Vento CFD LinkedIn icon
Vento CFD YouTube icon

Cookie 政策

bottom of page